We performed a comparison between Control-M and Fortra's Globalscape Managed File Transfer based on real PeerSpot user reviews.
Find out in this report how the two Managed File Transfer (MFT) solutions compare in terms of features, pricing, service and support, easy of deployment, and ROI."I think the administration part is much more valuable than any other feature."
"The most valuable feature is the reporting function. It allows us to pull up reports for specific information that the end-users are looking for."
"We use Control-M for maintenance on our Oracle and SQL Server databases. It automates maintenance on packages, including standard procedures on the databases themselves, snapshots, checking integrity, verifying the RDBMS of the databases, etc. It ensures they aren't clogged and that they are running smoothly and that there aren't any jobs stuck, eating up the performance of the server or any of the CPU cores."
"We can set up automated email notifications to the programmers or the whole team for a particular job. It helps save time because we're not consistently looking at the job to see if it has ended or failed."
"It is very stable. We hardly get calls in respect to issues on Control-M, particularly on version 9.0.19."
"BIM is helpful because we do not miss any SLAs, as we get to know the issue well in advance. It is the topmost service that has helped us provide better solutions for the business."
"Promotions between environments, as well as local, mass update, versioning, and self-service."
"In our bank, all new applications need to be implemented with Control-M. We try to look for the best way to establish communication between both products. One of the new features for us is Application Integrator. It is a very interesting feature because it lets us integrate with those applications that are not included in Control-M. By using Application Integrator, we can easily integrate new technologies. With the help of Application Integrator, we recently integrated with Blue Prism, which is a robotic product. We could integrate such processes into Control-M. Now, we are working with Ansible, and we are putting Ansible automated processes into Control-M."
"The Advanced Workflow Engine it comes with is brilliant because it allows us to create scripts and perform behind-the-scenes jobs that would otherwise require a third-party solution... You would have to create a special code on the outside to get all that other stuff done in the background. With Globalscape, we can get all of that done in one package."
"The fact that it is Windows-based was a huge factor for us because most of our endpoints are Windows-based. And the ability to configure it means standardization is available with the product."
"It bolsters security with features like Data Loss Prevention and seamless integration with DLP for a safe and compliant environment which enables real-time document sharing and control over file actions."
"The High Security Module is valuable. It allows for increased security. It allows me to integrate Globalscape with our Active Directory. So, we manage all our customer accounts outside of Globalscape, and it allows us to import them with LDAP queries. It's very convenient. It also gives our customers the confidence that it's a very secure product."
"A job skeleton can be used from test to production so you don't have to build jobs from scratch in production."
"The Event Rules functionality is a key feature. It is very simple to understand and work with. If you have a support team that doesn't know anything about coding, they can really relate to the way event rules are designed. So, I try to make them as simplistic as possible when we create file transmissions. When I first started working in Globalscape, a lot of the file transmissions were handled through Advanced Workflow, which is a similar product. We had a lot of scripts in Advanced Workflow. I moved them to Event Viewer in Globalscape because of the simplicity of building scripts and understanding how they work. It literally takes 5 to 10 minutes to set one up, but if you're in an advanced workflow, it could take an hour to two hours to understand via code what it is actually doing. It has definitely been a plus."
"Its ease of use is most valuable. Especially for the configuration of the rules, we don't need to have any scripting knowledge. Previously, we used to have a lot of custom scripts to transfer these files. Now, it's all managed in one place, and it's like a self-service. It's saving a lot of time for us."
"It made things easier. Before, there were five to 10 different software solutions spread out over 10 different servers. Now, everything is being centralized into one location; facilitating, supporting, maintaining, training people, etc. There have been gains just because Globalscape EFT is more efficient at moving things around than our previous other applications. For instance, if I am connecting to someone over the Internet or transmitting for the client, the speed of transmitting those files through SFTP is 20% to 30% faster than our previous automated solution. Therefore, we have seen time savings."
"There is definitely room for improvement. Version 9.0.20 actually comes with a web-based interface, but there are still a lot of things unavailable with it. There will eventually be more inclusions added into the web interface, but there is still a long way to go."
"Integration with some applications and platforms is complex and requires development. We have done some integration with the application integrator, but it was more like a manual solution. This is an area that can be improved."
"Everybody's biggest gripe is the reporting capability option. It is a gripe because there is a lot of information in Control-M, but the solution doesn't have a good reporting tool to extract that information. Now, if you want all that information, you need to rely on another third-party BI tool to extract the information out of Control-M."
"Its architecture is old. AutoSys gives more flexibility."
"I've never been very successful when researching ways to utilize Batch Impact Manager. It's a tool to set up dummy jobs in your job flow and it's supposed to come back to you and say, 'Okay, for this job flow, you are 50 percent complete at a certain point in time'...I would like things like Batch Impact Manager to be a little more user-friendly, out-of-the-box."
"Its installation can be better. Currently, we have to install it manually. The file transfer feature can also be improved. It is not very easy to transfer a file from business to business. In terms of new features, they can include new technologies. It can have API integration."
"The stability of Control-M has Not been great. A big thing we've been trying to work on with BMC is observability. Modern applications should be observable and resilient, but we're finding that sometimes Control-M is not very resilient and many times Control-M is not very observable."
"They really need to work on improving the web interface, as there are still a lot of bugs... In general, they need to do a lot of work on shoring up their testing and quality assurance. A lot of bugs seem to make it into the product."
"I do have some complaints or concerns around the centralized platform for the management of file transfer operations, and I know that they're working towards a better solution there. At its core, it's a good feature, but needs some improvements. I would like to see a web interface so that there is universal support across versions, because we have test and production environments that aren't always in sync. It would be nice to have one administrative interface to access both."
"The solution lags a bit when thousands of jobs, multiple users, and multiple developers are accessing it at the same time."
"Another area for improvement is the ARM (Auditing and Reporting Module) database, in terms of accuracy and the data being logged."
"It could improve its operations by incorporating real-time collaboration features like those offered by platforms such as Microsoft OneDrive and Office 365."
"We need some capability for faster transfers and large file transfers. If we want to transfer a terabyte file, it is not capable of doing that right now. They say it is possible, but we are not able to do so with our environment."
"The folder monitoring services need improvement. Currently, with the folder monitoring services in Globalscape, if any changes are made to our firewalls, network, or something else that affects the directory services where the files are located, for some reason, the folder monitoring services get cut out, and the files are left there. They remain in the folder without being sent. I have over 50 file transmission processes that I would have to go to manually re-drop a file into the folder so that it processes the file transmission. There are times where even though I re-drop a file, it still doesn't work. In that case, I have to resynchronize the folder monitoring process, and it is a very big headache on my side that I have to deal with. It is not only related to Globalscape or their development team. It is on our side too. I just sent a support case where we found out yesterday that we had a file transmission that hasn't run in a whole year, and it was an important one. No one on the business side or the IT support side, as well as the vendor, had indicated that the file wasn't received or the data hadn't been updated. I found out that it was the folder monitoring service that was the problem when I initially had the problem last October, and this was the file that I just missed. So, I re-dropped the file in yesterday, and the monitor worked. It runs every week, so we sent a file to that folder, and it processed that out."
"There are two ways to install Globalscape: as a standalone server or as a high-availability server, either Active-Active or Active-Standby. We are currently using standalone servers. That means if we want to upgrade the software, I shut down one of the two back-end servers, upgrade the software, make sure everything is correct, and then turn traffic back on to that one. I then proceed to upgrade the second server. With their high-availability solution, that is not a possibility. Both servers have to be shut down to perform the upgrade. We're a 24/7 shop. We don't have a window where we can have downtime."
"In the beginning, it could be considered a bit challenging."
More Fortra's Globalscape Managed File Transfer Pricing and Cost Advice →
Control-M is ranked 2nd in Managed File Transfer (MFT) with 110 reviews while Fortra's Globalscape Managed File Transfer is ranked 12th in Managed File Transfer (MFT) with 10 reviews. Control-M is rated 8.8, while Fortra's Globalscape Managed File Transfer is rated 8.4. The top reviewer of Control-M writes "We have seen quicker file transfers with more visibility and stability". On the other hand, the top reviewer of Fortra's Globalscape Managed File Transfer writes "Rock solid, secure, and excellent price and quality of service". Control-M is most compared with AutoSys Workload Automation, IBM Workload Automation, Rocket Zena, Automic Workload Automation and ESP Workload Automation Intelligence, whereas Fortra's Globalscape Managed File Transfer is most compared with MOVEit, WS_FTP Server, JSCAPE by Redwood, Sterling Commerce Connect:Direct and Fortra's GoAnywhere MFT. See our Control-M vs. Fortra's Globalscape Managed File Transfer report.
See our list of best Managed File Transfer (MFT) vendors.
We monitor all Managed File Transfer (MFT) reviews to prevent fraudulent reviews and keep review quality high. We do not post reviews by company employees or direct competitors. We validate each review for authenticity via cross-reference with LinkedIn, and personal follow-up with the reviewer when necessary.