Teledyne LeCroy Oscilloscopes Room for Improvement

DrProducbac2
Director of Marketing & Product Planning at a manufacturing company with 501-1,000 employees
I would like them to be current with the latest standards. So, as soon as a new standard comes in, ensure that it gets rolled into the existing software. View full review »
Packagine420
Packaging R&D Engineer at a tech company with 10,001+ employees
I would like them to add more post processing capabilities (e.g., with new product specifications). View full review »
Engineerc98d
Engineer at a tech company with 51-200 employees
I would like more technical details on what each packet represents and more information on the flow. The protocol side needs more improvement. View full review »
Productddf5
Product Architect at a tech vendor with 5,001-10,000 employees
Deeper memory is always useful to us for longer sample times. In addition, the interconnect methods to the device are a little limited right now. I'd like to see other ways of being able to connect to the device. View full review »

Sign Up with Email